Social icon Social icon

Aquatic Center Project

The Aquatic Center had severe rust issues around the perimeter of the building. This project involved cutting away 16 inches of metal at the base of the building, sandblasting bolts, replacing existing metal with cinder blocks and painting the cinder blocks.

Aquatic_before
BEFORE
Aquatic_after
AFTER